New office and site setup

Move in on Monday, and have everything work.

A new office means an internet provider, cablers, an electrician, a phone company and someone to set up the meeting room, all needing to line up. When one is late, nobody can work. We plan and run the IT side of the move, and test it before your staff arrive.

Registered cablers, a fixed quote, and engineers on site on day one.

  • One team for the whole fit-out
  • Tested before move-in
  • Fixed quote

Reviewed by Blake Bath, General Manager, on 31 October 2026.

New office and site setup

  1. Working on the first morning
  2. One team for the fit-out
  3. Cabling done once
  4. Room to grow
Working on day oneInternet, Wi-Fi, desks and phones tested first.

Read this page as

What changes

One team, one plan, one date.

You deal with us. We deal with the trades.

Working on the first morning

Internet, Wi-Fi, desks, printers and phones tested before staff walk in.

  • Tested
  • Labelled
  • Ready

Want the whole picture?See how it worksTalk to us

Office move planner

What has to happen, and in what order.

Put in your move date and what the new site needs. Copy the plan and share it with whoever's running the fit-out.

Tell us when you move and what's needed. You get the order things have to happen in, and what's at risk.

Count from today.
What does the new site need? (pick all)
Where's the fit-out at?

Your move plan

On track if you start now

  • Now. Send us the floor plan and the move date. We walk the space and quote.
  • Now. Order the new internet service. Business connections can take several weeks.
  • This week. Lock in data point positions with the builder so cabling goes in before the ceilings close.
  • With the fit-out. Registered cablers run, label and test every point. You get a signed certification statement.
  • Week before. Cabinet, switches and Wi-Fi installed and tested in the empty space.
  • Move day. Engineers on site from first thing, then support from there.

Want a person to look at your answer?Talk to usBook a free 30 minute chat (opens in a new tab)

Why it matters

Cabling has to be done by a registered cabler.

In Australia, telecommunications and data cabling must be done or supervised by a cabler registered under the ACMA's cabling rules, and it must meet the Wiring Rules (AS/CA S009:2020). That's the law, not a nice-to-have. Unregistered work can be unsafe and may cause problems with insurance.

Every cable run on a Real Bytes job is done by registered cablers, either our own people or trusted partners, and we stand behind it.

  • Registration card

    Ask to see it. The first letter of the number shows which of the four registrars holds it: ACRS, ASIAL, FPA Australia or TITAB.

  • Signed statement

    At the end of the job the cabler must give you a signed statement that the work meets the Wiring Rules. Keep it with your lease papers.

  • TCA2 for old cabling

    If they find existing cabling that doesn't meet the standards, they can tell you on a TCA2 form, even if it's outside the job.

"Real Bytes run the entire IT department for my business. The service is nearly instant, and proactive with advice. Outstanding."

Timothy Mark, Google review

What we look after

Everything IT in the new space.

  • InternetOrdered early, with a backup link if downtime would hurt.
  • Cabling and the comms cabinetData points, patching, labelling and testing.
  • Wi-Fi and networkPlanned from the floor plan and checked on site.
  • PhonesNumbers moved so calls ring at the new office on day one.
  • Meeting roomsScreens mounted, connected and tested with a real call.
  • Moving existing gearPacked after close, reconnected over the weekend.

Not sure where you stand?Get a free checkTalk to us

Mistakes we see

Four ways an office move goes wrong.

  • Internet ordered lastEverything else is ready and nobody can get online.
  • Data points after the ceilings closeCosts more, takes longer, and looks worse.
  • Points where the desks used to beThe plan changed and the cabling didn't.
  • No spare capacityFull switch, full cabinet, and five new starters next quarter.

What happens

Priced before anything is installed.

  1. Step 1Walk the space

    On site or from floor plans, we agree where people, screens and gear go.

  2. Step 2Fixed quote

    Every item, cable run and date listed before you commit.

  3. Step 3Build and test

    Installed and tested before move-in, often after hours.

  4. Step 4Move in

    Engineers on site for the first day, then support from there.

Ready when you are.Book a free 30 minute chat (opens in a new tab)Talk to us

Questions

What people ask before a move.

How far ahead should we call you?

As soon as you have a floor plan. A new business internet service can take several weeks, and cabling is easiest before the walls and ceilings go up.

Can you move our existing equipment?

Yes. We check what's worth keeping, move it, and only quote new gear where the old won't do the job.

Do you do the cabling yourselves?

Cabling is done by registered cablers, either our own people or trusted partners, depending on the location. Either way we manage it and stand behind it.

How do I know a cabler is registered?

Ask to see their registration card. The first letter of the number tells you which of the four registrars holds it, and you can check it's current with that registrar. At the end of the job they must give you a signed statement that the work meets the Wiring Rules.

What's a TCA2 form?

A registered cabler uses it to tell you about existing cabling that doesn't meet the standards, even if it's outside their job. It's common in older buildings. You decide what to fix.

Can the move happen without downtime?

Usually. We build the new site ahead of time and switch over after hours or on a weekend, so staff finish on Friday in the old office and start Monday in the new one.

Next step

Moving soon?

Send us the floor plan and the move date, and we'll plan the IT around it.

What happens next

  1. You pick a time that suits you.
  2. One of our engineers calls you. It takes 30 minutes and it's free. There's no slide deck.
  3. If we can help, we send a written plan. If we can't, we'll tell you who can.
  4. Nothing happens until you say yes.
  • Mason Wise, MSP Practice Lead at Real Bytes
  • Bill Nobbs-O'Brien, Service Desk & Field Engineer at Real Bytes
  • Travis Jacob, Operations Manager at Real Bytes

You talk to the people who do the work, not a sales team. Rather talk now? Call 07 3114 2808.

Already a client? Log a job in the client portal (opens in a new tab)